- Title
- Application of multiobjective optimization to scheduling capacity expansion of urban water resource systems
- Creator
- Mortazavi-Naeini, Mohammad; Kuczera, George; Cui, Lijie
- Relation
- Water Resources Research Vol. 50, Issue 6, p. 4624-4642
- Publisher Link
- http://dx.doi.org/10.1002/2013WR014569
- Publisher
- Wiley-Blackwell Publishing
- Resource Type
- journal article
- Date
- 2014
- Description
- Significant population increase in urban areas is likely to result in a deterioration of drought security and level of service provided by urban water resource systems. One way to cope with this is to optimally schedule the expansion of system resources. However, the high capital costs and environmental impacts associated with expanding or building major water infrastructure warrant the investigation of scheduling system operational options such as reservoir operating rules, demand reduction policies, and drought contingency plans, as a way of delaying or avoiding the expansion of water supply infrastructure. Traditionally, minimizing cost has been considered the primary objective in scheduling capacity expansion problems. In this paper, we consider some of the drawbacks of this approach. It is shown that there is no guarantee that the social burden of coping with drought emergencies is shared equitably across planning stages. In addition, it is shown that previous approaches do not adequately exploit the benefits of joint optimization of operational and infrastructure options and do not adequately address the need for the high level of drought security expected for urban systems. To address these shortcomings, a new multiobjective optimization approach to scheduling capacity expansion in an urban water resource system is presented and illustrated in a case study involving the bulk water supply system for Canberra. The results show that the multiobjective approach can address the temporal equity issue of sharing the burden of drought emergencies and that joint optimization of operational and infrastructure options can provide solutions superior to those just involving infrastructure options.
- Subject
- multiobjective; scheduling; capacity expansion; water resources
- Identifier
- http://hdl.handle.net/1959.13/1061461
- Identifier
- uon:16957
- Identifier
- ISSN:0043-1397
- Language
- eng
- Full Text
- Reviewed
- Hits: 1668
- Visitors: 2111
- Downloads: 490
Thumbnail | File | Description | Size | Format | |||
---|---|---|---|---|---|---|---|
View Details Download | ATTACHMENT01 | Publisher version (open access) | 1007 KB | Adobe Acrobat PDF | View Details Download |