 |
Using a BIM maturity matrix to inform the development of AEC integrated curricula |
Shih, Shan-Ying; Sher, Willy; Williams, Anthony |
2012 |
—
|
|
 |
Applying augmented reality for data interaction and collaboration in BIM |
Gu, Ning; Singh, Vishal; Wang, Xiangyu |
2010 |
—
|
|
 |
Building information modelling processes: benefits for construction industry |
Olatunji, O. A.; Sher, W. D.; Gu, Ning; Ogunsemi, D. R. |
2010 |
|
|
 |
A case study of the effects of attitude, behaviour, and project team culture on building information model use in a temporary project organisation |
Brewer, Graham; Gajendran, Thayaparan |
2010 |
—
|
|
 |
Collaboration in building information modelling: an application of gaming theory |
Olatunji, Oluwole Alfred; Sher, Willy David; Gu, Ning |
2010 |
—
|
|
 |
Experimentation of collaborative learning for construction estimating |
Olatunji, Oluwole Alfred; Sher, Willy |
2010 |
—
|
|
 |
The impact of building information modelling on construction cost estimation |
Olatunji, O. A.; Sher, W. D.; Ogunsemi, D. R. |
2010 |
|
|
 |
Influences on the adoption of BPM/BIM: an Australian perspective |
Brewer, G.; Gajendran, T.; Beard, C. |
2010 |
—
|
|
 |
Modelling the cost of corporate implementation of building information modelling |
Olatunji, Oluwole Alfred |
2010 |
—
|
|
 |
Technical features of BIM-servers for collaboration on building and construction projects |
Singh, Vishal; Gu, Ning; Wang, Xiangyu |
2010 |
—
|
|
 |
BIM server: features and technical requirements |
Singh, Vishal; Gu, Ning |
2009 |
—
|
|
 |
Building information modelling (BIM) system in construction in 2020: opportunities and implications |
Olatunji, Oluwole Alfred; Sher, William David |
2009 |
|
|
 |
BIM: expectations and a reality check |
Singh, Vishal; Gu, Ning; London, Kerry; Brankovic, Ljiljana; Taylor, Claudelle |
2008 |
—
|
|
 |
Industry perception of BIM adoption in design sector |
Gu, Ning; Singh, Vishal; Tsai, Jerry; Taylor, Claudelle; London, Kerry... More
|
2008 |
—
|
|