Please use this identifier to cite or link to this item: http://hdl.handle.net/1959.13/923208
- Title
- A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times
- Author/Creator
-
de Paula, Mateus Rocha;
Mateus, Geraldo Robson;
Ravetti, Martín Gómez
- Institution
- The University of Newcastle. Faculty of Engineering & Built Environment, School of Electrical Engineering and Computer Science
- Description
- Consider the problem of scheduling a set of jobs to be processed exactly once, on any machine of a set of unrelated parallel machines, without preemption. Each job has a due date, weight, and, for each machine, an associated processing time and sequence-dependent setup time. The objective function considered is to minimize the total weighted tardiness of the jobs. This work proposes a non-delayed relax-and-cut algorithm, based on a Lagrangean relaxation of a time indexed formulation of the problem. A Lagrangean heuristic is also developed to obtain approximate solutions. Using the proposed methods, it is possible to obtain optimal solutions within reasonable time for some instances with up to 180 jobs and six machines. For the solutions for which it is not possible to prove optimality, interesting gaps are obtained.
- Relation
- Computers and Operations Research Vol. 37, Issue 5, p. 938-949
- Publisher Link
- http://dx.doi.org/10.1016/j.cor.2009.07.006
- Date
- 2010
- Publisher
- Elsevier
- Keyword(s)
-
scheduling problems;
parallel machines;
Lagrangean relaxation;
relax-and-cut
- Resource Type
- journal article
- Identifier
- http://hdl.handle.net/1959.13/923208
- Identifier
- ISSN:0305-0548
- Reviewed

20 Visitors
22 Hits
0 Downloads